The 24-hour field

CRA Article 14(2)(a): a manufacturer who becomes aware of an actively exploited vulnerability has 24 hours to file an early warning indicating the Member States in whose territory it is aware the product has been made available.

Everything else on that form can be written under pressure. That list cannot. It is an inventory question, the answer lives in four spreadsheets and somebody's memory, and the clock does not stop while it is assembled.

The fleet already knows.

assurance bridge art14 advisory.json --ledger register.db \
  --received-by a.integrator --open
CASE-CTRL-2026-11 — intake drafted from CTRL-2026-11
  2 affected machine(s) in 2 Member State(s): DE, IT
  product  Grimaldi AR-7 3.8.2  (2 unit(s))
  !! 1 machine(s) are neither confirmed affected nor confirmed clear.

member_states_available — field 5 — assembled from the enrolled machines, with the serial numbers it was built from as its evidence. Exits non-zero when it cannot be completed, because a filing with a wrong field 5 is worse than a late one.

What it refuses to do

The bridge does the inventory. It does not do the judgement, and the prefill is deliberately partial:

{
  "title": "ControlCo advisory CTRL-2026-11: ...",
  "summary": "...",
  "member_states_available": ["DE", "IT"],
  "product_name": "Grimaldi AR-7",
  "product_version": "3.8.2"
}

notification_type is absent: an advisory naming a watchdog defect is not by itself an actively exploited vulnerability, and the track decides which clock runs. awareness_datetime is absent: awareness is a determination made after an initial assessment (C(2026) 5252 Annex §213), not the moment an email arrived. A prefill that guessed either would put a manufacturer's name on a statement nobody made.

Instead it produces the list a person must work through:

  still to be decided by a person:
    - Whether this is an actively exploited vulnerability, a severe incident,
      or neither.
    - Whether and when awareness was established. The advisory's publication
      time is when a document arrived, not when anyone understood it.
    - Whether the affected component is part of the product as placed on the
      market, or was integrated by somebody else downstream.
    - What is actually running on AR-7#0418: the version label and the artefact
      disagree, so it is in neither column.

--open records the signal and the product availability in the Article 14 register. The register then refuses a filing until somebody records a track and an awareness timestamp. That is the point, and it is tested.

Only confirmed machines count

A machine matched by artefact hash counts. A machine matched by version label, or whose label and artefact contradict the supplier's published hash, does not contribute a territory and is listed separately. The Member State list on a regulatory filing is not the place to include a machine nobody has looked at yet.

Why country is on the machine

MachineIdentity.country is ISO 3166-1 alpha-2, recorded explicitly or not at all. A site string is not a country: "Plant 2, Line 4" tells nobody where the machine is, and inferring one from free text is exactly how a wrong Member State ends up on a regulatory filing. A malformed code is refused at the manifest rather than carried to the form.

Record it at collection:

assurance collect run plan.json --root exports/ --serial 0412 \
  --actor a.person --site "Plant 2, Line 4" --country DE

Every machine enrolled without it is one that will block a filing at 03:00 on the day it matters.